Guide

Recovering PFAS costs at California’s investor-owned water utilities

The California Public Utilities Commission (CPUC) generally handles three kinds of PFAS money through separate procedures for the water utilities it regulates, and a Commission decision in a utility’s own case can set a different path. Operating costs are tracked in PFAS memorandum accounts, treatment plant capital goes through a general rate case or a separate application, and settlement proceeds and grants are accounted for under the CPUC’s contamination proceeds rules. This guide sets out each track, the advice letter tier that applies and the recent decisions behind it.

On November 15, 2026, we checked this guide against CPUC Resolution W-5226, Standard Practice U-27-W (revised April 16, 2014), General Order 96-B, Decisions 07-05-062, 10-04-001, 10-10-018, 10-12-058, 24-04-012, 25-01-036, 25-05-028 and 26-09-050, filings in A.25-07-003 and A.26-04-010, utility advice letters filed with the CPUC and the State Water Board’s SFY 2026-27 Drinking Water State Revolving Fund Intended Use Plan, its Emerging Contaminants supplement and Fundable List. Outcomes are decided utility by utility, so confirm your own path with your regulatory counsel and the CPUC’s Water Division. This guide isn’t legal or rate advice.

PFAS costs and the CPUC route for each
CostRouteHow it reaches rates
PFAS operating costs (testing and monitoring, notices, alternative supply)PFAS memorandum account, under Resolution W-5226Reviewed in the next general rate case or by a Tier 3 advice letter with full justification and an earnings test (Standard Practice U-27-W), unless a decision sets another tier, as D.26-09-050 does for Cal Water; recovery isn’t guaranteed
PFAS treatment plant capitalGeneral rate case or a separate application, not the memorandum account (W-5226; D.25-01-036)In Cal Water’s case, Tier 2 advice letters for completed projects within approved per-project budgets (D.26-09-050)
PFAS settlement proceeds, grants and insuranceContamination proceeds rules (D.10-10-018 and D.10-12-058)Treated as contributions in aid of construction rather than rate base: grants and loans go straight into dedicated sub-accounts, while settlements, damage awards and insurance proceeds are held in a memorandum account until spent
State Water Board fundingDrinking Water State Revolving Fund loans, which privately owned community water systems can apply for; grants and principal forgiveness depend on system size and disadvantaged-community status, and emerging contaminants funding has its own termsGrant-funded and principal forgiveness assets are kept out of rate base under CPUC rules (2026-27 Intended Use Plan)

PFAS memorandum accounts for operating costs

On August 6, 2020, the CPUC adopted Resolution W-5226, which established PFAS memorandum accounts for four Class A water utilities: Golden State Water, Suburban Water Systems, San Gabriel Valley Water and California Water Service (Cal Water). It reversed the Water Division’s rejection of the first three utilities’ advice letters and approved Cal Water’s. The accounts track “incremental operating costs,” and the resolution lists testing and monitoring, customer and public notifications, and alternative sources of supply. For plant and capital costs, the utilities “shall file applications to request increases in rate base” (Ordering Paragraph 3).

The CPUC found that PFAS regulatory developments were “an event of an exceptional nature” that “cannot have been reasonably foreseen in the utilities’ last respective general rate cases” (Findings 10 and 11). It also cited “the significant public health concerns associated with PFAS” and noted that it has authorized memorandum accounts for public policy reasons even when the usual conditions aren’t all met. The resolution adds that “the memo account process does not guarantee recovery of costs.”

Other utilities set up PFAS memorandum accounts by advice letter citing W-5226, including San Jose Water (Advice Letter 552, approved September 29, 2020) and Liberty Park Water (Advice Letter 302-W, approved October 21, 2020). Liberty Park Water’s tariff, for example, sends the balance to its next general rate case, or to Commission review if it passes 2% of adopted gross revenues. A party in California American Water’s current general rate case, the CPUC’s Public Advocates Office, has argued that complying with PFAS standards “should not be viewed as an exceptional event” (A.25-07-003, January 23, 2026). That’s a party’s position, not a CPUC ruling. Cal-Am later agreed in a settlement to withdraw the request at issue, its Special Request 8 for a water contamination memorandum account, without prejudice. A November 5, 2026 proposed decision, which the CPUC hasn’t yet voted on, doesn’t oppose the withdrawal; if it’s adopted, the question stays open for future cases.

Getting a memorandum account balance into rates

The Water Division’s Standard Practice U-27-W sets the general rules. Memorandum account treatment is for costs from “events of an exceptional nature” that aren’t under the utility’s control, couldn’t reasonably have been foreseen in the last general rate case, will occur before the next one, are substantial and have ratepayer benefits (paragraph 27). A new memorandum account is requested by Tier 2 advice letter. Recovering the balance by advice letter takes a Tier 3 advice letter “with full justification of all expenses” and a recorded earnings test, and a Commission resolution (paragraphs 54 and 55). General Order 96-B’s Water Industry Rules list memorandum account amortization as Tier 3 (Rule 7.3.3(7)).

To recover tracked costs, the CPUC has said a utility must show the costs aren’t covered by other authorized rates, are appropriate for ratepayers to pay, were prudently incurred and are reasonable in amount (D.10-04-001). A memorandum account “does not guarantee that the utility will recoup the tracked amount” (Standard Practice U-27-W, paragraph 6).

Cal Water’s PFAS case shows one outcome. In D.26-09-050, adopted September 17, 2026, the CPUC authorized Cal Water to recover its PFAS memorandum account costs incurred through December 31, 2024, plus interest, by Tier 1 advice letter. It also named two cost categories as valid for future recovery “if demonstrated to be reasonable, prudent, and incremental”: water sample collection, testing and analysis, and chemicals and filtration materials (Ordering Paragraph 3).

Treatment plants go through a rate case or an application

The CPUC has repeatedly sent PFAS treatment capital to a formal proceeding rather than a memorandum account. W-5226 found that “the appropriate place to request rate increases to cover incremental plant costs is an application” (Finding 12). In D.24-04-012, the CPUC dismissed without prejudice Cal Water’s request to add capital costs to its PFAS memorandum account and recover them through periodic Tier 2 advice letters. In Golden State Water’s general rate case, D.25-01-036 ordered it to present PFAS treatment capital plans “in a separate application or in its next general rate case filing” and not to record them in its PFAS memorandum account (Ordering Paragraph 3); the CPUC denied rehearing in D.25-05-028.

Under the Rate Case Plan, each Class A water utility, one with more than 10,000 service connections, is scheduled to file a general rate case once every three years, with certain exceptions. It submits a proposed application by November 1 or May 1 and files the application the following January 1 or July 1 (D.07-05-062, footnote 1 and Appendix A). Golden State Water filed its next general rate case on July 1, 2026, for a 2028 test year.

A separate application can move faster for a defined program. Cal Water filed its PFAS Compliance Program application (A.25-06-001) in June 2025, and D.26-09-050 adopted its settlement with the Public Advocates Office. The decision authorizes a total capital budget of $113,053,820 for 43 PFAS treatment projects. Cal Water recovers actual costs for projects that are used and useful by Tier 2 advice letter, no more than once a year per rate area and no later than December 31, 2028; costs above the caps or filed later aren’t recoverable under the settlement and may be raised in a future general rate case (Ordering Paragraph 2). That fits General Order 96-B, which lets a rate base offset be handled as Tier 2 when the Commission already approved it with a budget cap, the project’s scope is consistent with what was approved, and the request is at or below the cap (Water Industry Rule 7.3.3(8); D.26-09-050, footnote 35). The decision also states that approving the settlement isn’t a precedent “for or against” Cal Water or the Public Advocates Office in any other proceeding (Ordering Paragraph 6).

San Jose Water filed a similar application (A.26-04-010) on April 10, 2026, asking for an increase of $25,171,741, or 4.05%, to fund its PFAS Compliance Program, according to the notice of the application posted on the CPUC website. The CPUC described the request as under review in October 2026. The July 29, 2026 scoping memo estimated a proposed decision in the first quarter of 2027, but an October 15, 2026 ruling set evidentiary hearings for January 26 to 28, 2027, so check the docket for the current schedule.

Settlement proceeds and grants

The CPUC’s rules for contamination proceeds apply to all investor-owned water utilities. Under D.10-10-018, grants, government loans, damage awards, settlements, government-ordered funds and insurance proceeds used to replace contaminated water supplies are treated as contributions in aid of construction rather than included in rate base (Ordering Paragraph 1). Government grants and loans go directly into dedicated sub-accounts of Account 265. Damage awards, settlements, government-ordered funds and insurance proceeds are first placed in a memorandum account “until the need for making expenditures arises,” and approval to move them into their sub-account is sought by a Tier 3 advice letter (Ordering Paragraphs 2 to 4). Any sharing of net proceeds between ratepayers and shareholders needs Commission approval, applies only to proceeds received after the contaminated plant is replaced or remediated and all costs are determined, and is allowed where circumstances warrant (Ordering Paragraph 5). D.10-12-058 sets the implementing rules in its Appendices A, B and C.

D.26-09-050 applies those rules to Cal Water’s PFAS program: any grant, subsidy, settlement proceeds or other funding that could offset its PFAS Compliance Program costs must be accounted for under D.10-10-018 and D.10-12-058 (Ordering Paragraph 4). The decision notes that Cal Water may receive funds from “3M, Dupont, Tyco, and BASF.” San Jose Water’s scoping memo likewise puts “settlement proceeds, potential insurance recoveries, or other funding mechanisms” in scope.

Utilities have opened separate accounts for PFAS settlement money. San Jose Water set up a Water Contamination Litigation Memorandum Account by Tier 1 Advice Letter 618 after an initial 3M payment (approved July 21, 2025), and Liberty Park Water did the same by Tier 1 Advice Letter 347-W (approved September 5, 2025). Golden State Water filed Tier 2 Advice Letter 1966-W on June 12, 2025 for a PFAS Contamination Litigation Proceeds Memorandum Account, stating that “the settlement proceeds will offset the costs of PFAS treatment facilities.” For the settlement claim deadlines, see Funding PFAS projects at California water systems.

State Water Board funding for investor-owned utilities

The State Water Board’s SFY 2026-27 Drinking Water State Revolving Fund Intended Use Plan covers “publicly and privately-owned” community water systems. A privately owned system’s project, including one by a CPUC-regulated utility, must have “a clear and definite public purpose” and solely benefit the system’s customers. Under the base plan’s general grant and principal forgiveness criteria, that money goes mainly to projects for small and medium disadvantaged communities that address a Failing or At-Risk status, and large community water systems aren’t eligible; consolidation and emerging contaminants projects have their own eligibility rules. CPUC-regulated entities are eligible for funding only if the applicable CPUC rules are satisfied, including rules that keep grant-funded and principal forgiveness assets out of rate base so the funds benefit ratepayers, and they must obtain any CPUC approvals required.

The Emerging Contaminants supplement (Appendix L) says some base plan limits on grant funding for work on private property “may not be applicable” to emerging contaminants funding, so ask the Division of Financial Assistance which conditions apply to your project. The SFY 2026-27 Emerging Contaminants Fundable List includes PFAS treatment projects of Cal Water, Golden State Water and Suburban Water Systems; being on the list isn’t a funding agreement.

How Weirline helps

Weirline keeps each source’s PFAS results, the notices they triggered and the dates behind them in one place. That gives regulatory staff the water quality record to use alongside their financial records when preparing a memorandum account review, a rate case showing or a settlement claim. Your team approves every output.

Ask for this view of your sourcesRequest a demo

Sources

See your own sources on the lists.

Send us your water system’s name or PWS ID. We’ll send back every source the State Water Board’s current lists show for it under GO 2025, GO 2022 and GO 2024, and what each order asks of it next.

The Compliance Consortium LLC

Founded by Christian Velasquez, a compliance professional in Sacramento, California. A CPUC Supplier Clearinghouse–verified MBE and LGBTBE, No. 26000674.

The Compliance Consortium on LinkedIn

Weirline is a product of The Compliance Consortium LLC and is not affiliated with the State Water Resources Control Board. Its outputs are drafts your team approves, not filings or regulatory determinations; confirm requirements with your district.

© 2026 The Compliance Consortium LLC